Interior Remodels – Interior remodels can be very exciting. From flooring to ceiling and all points in between, Jadway Construction can design alterations and remove, replace, modify and install all components of your interior dwelling space. Click on kitchens and baths to see some of our custom work there. Interior water damage, when it happens, can throw your life into a momentary frenzy. If it happens to you, call Jadway Construction. We will respond immediately to your call. Call Jim today, for a free consultation. 561-743-6709
 

A1  Damage by water leak in refridg

A10  Cant see any evidence of repair

A2  Water came under the wall

A3 Damaging drywall - wood flooring

A4  Drywall was wet four feet up wall

0

1

2

3

4

A5  Wall is opened up - drying out

A6  Wood - drywall treated for mildew

A7  Cutting  4 feet up to stagger seams

A8  Finishing walls for painting

A9  Painting completed - flooring reinstalled

5

6

7

8

9

B1  Bay window leaked on all three sides

B2  Leaking bay window need glazing

B3  Ground a v in stone - caulked

B4  Replace seats - drywall - flooring

C1  Old leaking water heater was removed

10

11

12

13

14

C10  All put back together

C2  Drywall removed living room wal

C3  Drywall removed from kitchen wall

C4  Drywall removed bathroom wall

C5  Drywall removed from bathroom walls

15

16

17

18

19

C6  Mold cleaned - encapsulated

C7  New water heater installed

C8  Drywall replaced - new vanity installed

C9  Finished - painted

D1  Air handler in attic leaked

20

21

22

23

24

D10  Applied mildew inhibitor

D11  Insulation installed in hallway ceilling

D12  Drywall installed hallway ceiling

D13  Drywall installed in closet - hallway

D14  More new drywall in hallway

25

26

27

28

29

D15  New drywall in hallway closet

D16  Taped ceiling - hallway closet

D17  Hallway ceiling drywalled - textured

D18  Closet lin hallway painted

D19  Bi-fold doors installed for closet in hallway

30

31

32

33

34

D2  High humidity - mold

D20  Drywall -ceiling texture finished

D21  Drywall in hallway painted

D22  Liner over floated shower sub-floor

D23 Duro-Rock installed - floor being floated

35

36

37

38

39

D24  Shower floor tile installed on diagonal

D25  Shower walls - towel bar installed

D26  Trim for shower valve - head

D3  The hallway ceiling collapsed

D4  Back side of shower wall

40

41

42

43

44

D5  Mold on back of shower wall

D6  More drywall removed

D7  Backside of drywall in guest room

D8  AC plenum was removed- replaced

D9  AC plenum through wall in bedroom

45

46

47

48

49

bannercreator-nu

 561-743-6709
 JadwayConstruction@gmail.com

 JADWAY Construction
 Division of Desiderio Enterprises, Inc.

 Crc 1327676
 561-262-2299